This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
- Home
- >
- Case Studies
- >
- St Elizabeth’s School Roof Refurbishment
St Elizabeth’s School Roof Refurbishment
Saint Elizabeth’s Primary School wanted a durable system to waterproof all the flat roof areas of the school. The contractor choose to use RubberBond FleeceBack system as it is a completely cold installation and use of low odour adhesives caused little disruption to the day to day running of the school.
After numerous core samples were taken the existing decking and covering were left in place and new insulation layer was bonded in place. This saved the school considerable waste disposal costs and ensured that water ingress during refurbishment was avoided.
Speak to a member of our team for help and advice on the best solution for your flat roofing project; call us on 01494 448792 or email us at [email protected]
Project
St Elizabeth’s School
Client
APM Roofing Ltd
Project Type
Primary School Roof Refurbishment
Products Used
RubberBond Fleeceback
Roof Area: 510m²
Location
Saint Elizabeth’s Road, Coventry